Here we have a very simple bathroom remodel.
We installed greenboard over the existing plaster walls. Then we installed a ceramic tile floor over an existing porcelain tile floor after removing vinyl tile from the surface.
Afterwards, we painted ceiling and walls and then installed the grout at the tile joints.
Seal the grout lines. Job is complete
On this project we completely gutted an old farmhouse originally built in 1890. We removed…
Below You can see what the old deck looked like. The client wanted more space…
In this post we are exhibiting a deck replacement. It features pressure treated lumber and…
In this post we are installing new vinyl plank flooring in a kitchen and breakfast…
Here we are installing a pocket door and also a barn door. Unfortunately we did…
Here, we are performing the removal of a load-bearing wall to open up a kitchen…